- (254) 292- 9763
- [email protected]
- Waco, TX
$50.00
At least one Transceiver (TS) is needed for up to 6 Movement Monitors that are in range to relay data from a Movement Monitor to our database.
The principle component of the structural crack monitoring system. One Movement Monitor (MM) tracks crack movement in two directions 0.2 mm/.01 in increments.
Without leaving the desk, an engineer can quickly update the status of multiple locations and produce detailed professional graphics depicting crack performance over time. Hour-by-hour movements of a building can be easily correlated with daily variables of weather and temperature along with seasonal changes.
Better Data – Better Decisions